| Pre-construction |
|
The following outline will give a brief description of the preconstruction services that Harco Constructors offers: A. Initial Scheduling • Design duration • Design review dates • Bid package dates • Construction milestones • Permit acquisition plan • Regulatory agency submittal dates • Estimate dates • Guaranteed maximum price dates • Cash flow commitment
B. Review Existing Concepts • Evaluate cost • Identify Phase 1 and Phase 2 assessment firms • Evaluate layouts for function • Evaluate material/ systems selections • Offer revisions/ corrections
C. Prepare Revised Design Criteria • Aid owner in preparing final criteria • Distribute criteria
D. Facility Design Analysis • Review Project criteria • Suggest system alternatives • Aid in selecting systems
E. Conceptual Design • Evaluate Function • Evaluate Cost • Evaluate systems/ material selection • Provide value analysis • Provide constructability comments • Review schedule • Review overall budget conformance
G. Long Lead Procurement • Identify long-lead items and instigate plan for procurement
H. Job Information & Policy Brochure • Formulate and produce job information and policy brochure
I. Accident Prevention • Instigate, formulate, and publish safety plan
J. Environmental Protection Plan • Evaluate potential interference with ongoing operations of others which could be affected by this facility • Instigate, formulate environmental plan • Storm Water Pollution Prevention Plan
K. Design Development • Re-Evaluate function • Evaluate cost • Evaluate systems/ material selection • Provide value analysis • Provide constructability comments • Review schedule • Review overall budget conformance
L. Permit Acquisition (Phased) • Meet with applicable regulatory agencies and advise of plan of attack • Adhere to regulatory agency requests to maintain schedule • Coordinate response to regulatory agency comments • File for permit • Respond to permit clarification • Acquire • Maintain updated permit during construction
M. Budget Controls • Preliminary budget update • Trend estimate • Detailed estimate • Initial GMP (Guaranteed Maximum Price) • Final GMP • As design continues, progress from preliminary budget through final GMP • Trend on a weekly basis throughout design and keep the owner informed
N. Value Engineering • Selection of most cost efficient methods, materials, and schedule • Propose throughout design effort and immediately following each formal budget estimate • Value Engineering tracking: o Provide complete list of value engineering ideas and associated estimated cost savings o Categorize ideas and cost savings by type: value engineering , quality, reduction, or quality reduction o Document decision with approval or rejection of ideas o Track the approved value engineering through the design phase
O. Guaranteed Maximum Price • Prepare final Estimate • Guarantee construction price |